JIANA ZHILIAN Wire Harness · Dongguan, China
Capabilities

Wire in one door, tested assembly out the other

Six process steps and two line types, all on the same floor. Nothing is subcontracted between cutting and test — which is why a drawing revision reaches the line the same week instead of the same quarter.

1,500 m²
Plant area
200+
Employees
30,000+
Pcs per day
13 yrs
Since 2013
Process chain

Eight steps, one building

  1. Wire cutting & stripping at the Jiana Zhilian plant
    01

    Wire cutting & stripping

    Automatic cut-and-strip machines handle discrete leads from 0.5 to 6.0 mm². Cut length is held to ±1 mm; strip length to the drawing. Multi-conductor cable is processed in one pass so the cores stay in sequence.

    0.5–6.0 mm² · ±1 mm cut tolerance

  2. Crimping at the Jiana Zhilian plant
    02

    Crimping

    Semi-automatic presses with in-line crimp-force monitoring. Crimp height is measured on a sample each batch and pull-force tested on a tension meter, with both recorded against the work order.

    Crimp height + pull-force sampled per batch

  3. Injection molding at the Jiana Zhilian plant
    03

    Injection molding

    Connector bodies, strain-relief boots and small housings are molded in-house. Because the tool sits in our building, a drawing revision does not wait for a third-party molder to re-open a schedule.

    In-house tooling for bodies and boots

  4. Overmolding at the Jiana Zhilian plant
    04

    Overmolding

    TPE and PVC overmolding for sealed cable exits and molded connector transitions. Used where the cable exit, not the connector, is the weak point — vehicle, marine and outdoor equipment.

    TPE / PVC · sealed cable exits

  5. Assembly at the Jiana Zhilian plant
    05

    Assembly

    Harness build on jig boards to the drawing. Branches are laid out, taped or sleeved, and the finished assembly is labelled with its part number before it moves to test.

    Jig-board routing · taped or sleeved

  6. Automated production at the Jiana Zhilian plant
    06

    Automated production

    Rotary terminal machines carry high-volume discrete leads — the single-wire and two-wire parts used in consumer products by the million. Automated lines keep unit cost and crimp consistency under control.

    High-volume discrete leads

  7. Harness line at the Jiana Zhilian plant
    07

    Harness line

    Parallel lines for multi-branch assemblies: cut, crimp, sleeve, tape and label in sequence. Multi-branch parts are checked against the drawing at the end of the line rather than at the end of the month.

    Multi-branch · sleeving · labeling

  8. Electrical test at the Jiana Zhilian plant
    08

    Electrical test

    100% continuity on every assembly. High-current and high-voltage parts additionally get contact-resistance measurement and a dielectric withstand (hipot) test to the level on the drawing.

    100% continuity · hipot on request

What we can work with

Wire range 0.5 – 6.0 mm² (20 – 10 AWG) discrete; heavier by arrangement
Cut length tolerance ± 1 mm
Connector types XT / EC / MR / MT / LCB, MC4, SAE, Anderson, DC barrel, M8 / M12 / M16, pluggable terminal blocks, ring and fork lugs
Sleeving Heat-shrink, braided sleeve, spiral wrap, tape, conduit
Testing 100% continuity; hipot and contact-resistance on request
Packing Inner bag, carton, pallet; customer labeling supported
Daily capacity 30,000+ pcs
MOQ 500 pcs per part number (100 pcs for prototypes)

What we need from you

  • A drawing (PDF, DXF or a dimensioned sketch)
  • Connector part numbers if they are specified
  • Target quantity and annual volume
  • Any test requirement beyond continuity
  • Destination, so we can quote the shipping term
Send the drawing
On site

Eight areas, photographed on site

  • Cut & strip area
    01 Cut & strip
  • Crimping area
    02 Crimping
  • Injection molding area
    03 Injection molding
  • Overmolding area
    04 Overmolding
  • Assembly area
    05 Assembly
  • Automated lines area
    06 Automated lines
  • Harness line area
    07 Harness line
  • Production floor area
    08 Production floor

Not sure whether we can build it?

Send the drawing anyway. If it is outside our range we will say so, and usually suggest who can.

Request a quotation