JIANA ZHILIAN Wire Harness · Dongguan, China
Quality system

Quality is checked in process, not at the end

Four control points sit between incoming material and the export carton. Each one is recorded against the work order, so a claim can be traced back to the batch that made it — and to the crimp sample taken from it.

  • IATF 16949
  • ISO 9001
  • RoHS
  • REACH
Control points

Four gates before packing

  1. 01

    Incoming material

    Wire, terminals and housings checked against drawing and certificate of conformance before release to production.

  2. 02

    Crimp monitoring

    Crimp height and pull-force sampled per batch, recorded against the work order.

  3. 03

    Electrical test

    100% continuity on every assembly; hipot and contact-resistance test for high-current parts.

  4. 04

    Final inspection

    AQL sampling on appearance, dimensions and labeling before export packing.

What we measure with

  • Continuity / hipot tester

    Every assembly is checked for continuity against its wiring table. High-current and high-voltage parts also get a dielectric withstand test.

  • Crimp force and height gauge

    Crimp height measured on a sample per batch, with pull-force tested on a tension meter and recorded against the work order.

  • Contact resistance meter

    Milliohm measurement on high-current contacts — the difference between a 0.4 mΩ and a 2 mΩ joint is heat in service.

  • Visual and dimensional inspection

    AQL sampling on appearance, dimensions, labeling and packing before the carton is closed.

Electrical test station checking continuity on finished harnesses
Electrical test — 100% continuity on every assembly.

Traceability

A claim is only answerable if the batch can be found. Every order carries a batch number, and the records that matter are filed against it rather than against the month.

  • Batch number printed on the carton and the inner bag
  • Crimp sample records kept against the work order
  • Wire and terminal certificates of conformance filed by batch
  • Drawings and revisions controlled; the revision in force is printed on the label

If something does go wrong

Send the batch number and photos of the defect. We pull the crimp records for that batch, identify whether the fault is material, tooling or assembly, and reply with a containment and replacement plan — normally within two working days.

Report an issue

Need our certificates for your file?

IATF 16949, ISO 9001, RoHS and REACH declarations are available on request.

Request documents